Walker Excavation

Chief Joseph Middle School (2007)

Chief Joseph Middle School

  • Bozeman, Montana
  • Summer 2007
  • 25,000 cy earthwork, 3270 If of site utilities, and gravel placement and pavement preparation for the 141,000 sf parking lot for the middlle school
  • Foundation excavation, backfill, and slab gravel for the 79,500 sf building

(back to Expertise page)

Montana Corporate Office
270 Floss Flat Road, Suite B
Belgrade, Montana 59714
Phone: 406-388-5834
Fax: 406-388-5837
info@walkerexcavation.com

Site Design © 2010